docs: align scheduling review references
This commit is contained in:
@@ -58,10 +58,12 @@ Reuse the scheduler, activation, lineage, and reducer-aware barrier machinery:
|
||||
- [`ADR-0006: explicit fork and topology-driven gather`](adr/0006-explicit-fork-and-topology-driven-gather.md)
|
||||
- [`Draft contract and verification gates`](superpowers/specs/2026-09-06-fork-gather-design.md)
|
||||
|
||||
Production planning remains gated on correlation analysis and merge-order
|
||||
semantics. The draft records two reproduced reference-model defects and points
|
||||
to archived runnable research; passing that prototype's tests is not approval
|
||||
to copy it into the runtime.
|
||||
Production planning remains gated on correlation analysis, merge-order
|
||||
semantics, and closure of the draft's owner-completion, failure-cleanup,
|
||||
scope-boundary, occurrence-state, and checkpoint-integration decisions. The
|
||||
draft records two reproduced reference-model defects and points to archived
|
||||
runnable research; passing that prototype's tests is not approval to copy it
|
||||
into the runtime.
|
||||
|
||||
The isolated
|
||||
[`reference verification plan`](superpowers/plans/2026-09-07-fork-gather-reference-verification.md)
|
||||
|
||||
Reference in New Issue
Block a user