docs: plan presentation lifecycle story expansion

This commit is contained in:
lda
2026-07-09 21:15:27 +07:00 Verified
parent 7ce81c8f23
commit 3a76a24950
3 changed files with 1228 additions and 8 deletions
+16 -8
View File
@@ -40,6 +40,7 @@ Design contracts:
- [`adaptive presentation canvas and evidence inspector`](superpowers/specs/2026-07-05-adaptive-presentation-canvas-design.md)
- [`Scene 10 guided product moment`](superpowers/specs/2026-07-09-scene-10-guided-product-moment-design.md)
- [`presentation live/replay truth`](superpowers/specs/2026-07-09-presentation-live-replay-truth-design.md)
- [`presentation lifecycle story expansion`](superpowers/specs/2026-07-09-presentation-lifecycle-story-expansion-design.md)
Implementation order:
@@ -152,9 +153,16 @@ Implementation order:
Cancel is terminal in presentation mode and does not advance into submitted
evidence. Implementation:
[`Scene 10 factual run state`](historical/superpowers/plans/2026-07-09-scene-10-factual-run-state.md).
21. Future: presenter companion, Scene 10 product graph, final scene visuals,
evidence assets, and rehearsal timing.
22. Add a static slide/appendix shell only after presentation mode is clear.
21. Next: presentation lifecycle story expansion splits the current crowded run
proof into prepared lifecycle, run start, typed human boundary, and
resume/output/evidence scenes. Draft -> Artifact -> Deployment -> Run must
be visible before the run inspector details. Design:
[`presentation lifecycle story expansion`](superpowers/specs/2026-07-09-presentation-lifecycle-story-expansion-design.md).
Plan:
[`presentation lifecycle story expansion plan`](superpowers/plans/2026-07-09-presentation-lifecycle-story-expansion.md).
22. Future: presenter companion, final scene visuals, evidence assets, and
rehearsal timing.
23. Add a static slide/appendix shell only after presentation mode is clear.
Astro remains an option, not the default next surface.
Presentation wishlist / defense readiness:
@@ -234,12 +242,12 @@ Presentation wishlist / defense readiness:
[`Scene 10 guided product moment`](superpowers/specs/2026-07-09-scene-10-guided-product-moment-design.md).
Implementation:
[`Scene 10 guided product moment plan`](historical/superpowers/plans/2026-07-09-scene-10-guided-product-moment.md).
- Active: presentation live/replay truth distinguishes reviewed replay evidence,
live target readiness, live active run state, and replay fallback so the demo
can look credible without implying fake live execution. Design:
[`presentation live/replay truth`](superpowers/specs/2026-07-09-presentation-live-replay-truth-design.md).
- Next: presentation lifecycle story expansion makes the demo climax less
run-only by adding explicit prepared lifecycle scenes before the run,
interrupt, output, and trace proof. Design:
[`presentation lifecycle story expansion`](superpowers/specs/2026-07-09-presentation-lifecycle-story-expansion-design.md).
Plan:
[`presentation live/replay truth plan`](superpowers/plans/2026-07-09-presentation-live-replay-truth.md).
[`presentation lifecycle story expansion plan`](superpowers/plans/2026-07-09-presentation-lifecycle-story-expansion.md).
- Evidence assets and rehearsal timing: prepare fallback screenshots/recordings,
expected run states, and a timed walkthrough checklist for a 15-minute defense.
- Presenter companion feasibility: decide whether phone/laptop control is local