@@ -186,11 +186,12 @@ Presentation visual audit, July 11:
|
||||
|
||||
- Baseline-good: Scenes 3, 4, and 5 are good enough for now. Do not churn them
|
||||
unless a later rehearsal exposes a concrete problem.
|
||||
- Partially complete: Scenes 2, 6, and 7 have concrete focal artifacts, and
|
||||
Scenes 8-10 share a prepared authoring/run spine. Scene 1 still needs a
|
||||
title-composition repair so it introduces the agent-shaped product goal
|
||||
before Scene 2 explains the automation problem. Design:
|
||||
[`presentation opening title`](superpowers/specs/2026-07-11-presentation-opening-title-design.md).
|
||||
- Completed: Scene 1 introduces the agent-shaped product goal through
|
||||
`Planner -> Tool surface -> Runner / platform`, then identifies the last
|
||||
role as the implemented contribution. Scene 2 remains responsible for the
|
||||
automation problem. Scenes 2, 6, and 7 retain their concrete focal artifacts,
|
||||
and Scenes 8-10 share a prepared authoring/run spine. Implementation:
|
||||
[`presentation opening title`](historical/superpowers/plans/2026-07-11-presentation-opening-title.md).
|
||||
- Completed: Scenes 11-12 now use decision-led approval, continuation-led
|
||||
resume/output, and compact factual trace rows so approval, resume, output,
|
||||
and trace remain factual without competing panels or repeated low-signal
|
||||
@@ -242,11 +243,11 @@ Recommended next visual slices:
|
||||
authentic external-agent handoff and factual prepared-authoring proof.
|
||||
Implementation:
|
||||
[`presentation agent authoring story plan`](historical/superpowers/plans/2026-07-11-presentation-agent-authoring-story.md).
|
||||
7. Next: rebuild Scene 1 as an agent-shaped title composition: `Planner ->
|
||||
Tool surface -> Runner / platform`, with the last role labelled
|
||||
`Implemented contribution`. Keep Scene 2 responsible for the automation
|
||||
problem. Design:
|
||||
[`presentation opening title`](superpowers/specs/2026-07-11-presentation-opening-title-design.md).
|
||||
7. Completed: Scene 1 now introduces the agent-shaped product goal through
|
||||
`Planner -> Tool surface -> Runner / platform`, then identifies the last role
|
||||
as the implemented contribution. Scene 2 remains responsible for the
|
||||
automation problem. Implementation:
|
||||
[`presentation opening title`](historical/superpowers/plans/2026-07-11-presentation-opening-title.md).
|
||||
8. Next: harden the live/replay defense rehearsal path, including submitted and
|
||||
revision-requested same-run resumes, replay fallback, exact deep links, and
|
||||
reset instructions. Design:
|
||||
|
||||