docs: complete presentation opening title slice

This commit is contained in:
lda
2026-07-12 00:17:11 +07:00 Verified
parent 96e6e93c87
commit 6a3e9c5a82
2 changed files with 27 additions and 26 deletions
+11 -10
View File
@@ -186,11 +186,12 @@ Presentation visual audit, July 11:
- Baseline-good: Scenes 3, 4, and 5 are good enough for now. Do not churn them
unless a later rehearsal exposes a concrete problem.
- Partially complete: Scenes 2, 6, and 7 have concrete focal artifacts, and
Scenes 8-10 share a prepared authoring/run spine. Scene 1 still needs a
title-composition repair so it introduces the agent-shaped product goal
before Scene 2 explains the automation problem. Design:
[`presentation opening title`](superpowers/specs/2026-07-11-presentation-opening-title-design.md).
- Completed: Scene 1 introduces the agent-shaped product goal through
`Planner -> Tool surface -> Runner / platform`, then identifies the last
role as the implemented contribution. Scene 2 remains responsible for the
automation problem. Scenes 2, 6, and 7 retain their concrete focal artifacts,
and Scenes 8-10 share a prepared authoring/run spine. Implementation:
[`presentation opening title`](historical/superpowers/plans/2026-07-11-presentation-opening-title.md).
- Completed: Scenes 11-12 now use decision-led approval, continuation-led
resume/output, and compact factual trace rows so approval, resume, output,
and trace remain factual without competing panels or repeated low-signal
@@ -242,11 +243,11 @@ Recommended next visual slices:
authentic external-agent handoff and factual prepared-authoring proof.
Implementation:
[`presentation agent authoring story plan`](historical/superpowers/plans/2026-07-11-presentation-agent-authoring-story.md).
7. Next: rebuild Scene 1 as an agent-shaped title composition: `Planner ->
Tool surface -> Runner / platform`, with the last role labelled
`Implemented contribution`. Keep Scene 2 responsible for the automation
problem. Design:
[`presentation opening title`](superpowers/specs/2026-07-11-presentation-opening-title-design.md).
7. Completed: Scene 1 now introduces the agent-shaped product goal through
`Planner -> Tool surface -> Runner / platform`, then identifies the last role
as the implemented contribution. Scene 2 remains responsible for the
automation problem. Implementation:
[`presentation opening title`](historical/superpowers/plans/2026-07-11-presentation-opening-title.md).
8. Next: harden the live/replay defense rehearsal path, including submitted and
revision-requested same-run resumes, replay fallback, exact deep links, and
reset instructions. Design: