docs: complete defense rehearsal gate
This commit is contained in:
@@ -310,10 +310,13 @@ separate activity after these surfaces are stable.
|
||||
[`presentation visual scale and color pass`](superpowers/specs/2026-07-12-presentation-visual-scale-color-pass-design.md).
|
||||
Implementation:
|
||||
[`presentation visual scale and color pass plan`](historical/superpowers/plans/2026-07-12-presentation-visual-scale-color-pass.md).
|
||||
8. **Rehearsal gate:** run all 14 scenes at 16:9 and 4:3, verify the Scene 8 →
|
||||
Scene 11 → Scene 12 path in live and replay modes, then review the story
|
||||
flow, coverage, and ordering separately. Implementation plan:
|
||||
[`defense rehearsal gate`](superpowers/plans/2026-07-13-defense-rehearsal-gate.md).
|
||||
8. **Completed: defense rehearsal gate:** all 14 scenes have paired `1280x720`
|
||||
and `1024x768` replay captures, and the rehearsal matrix, log, and story
|
||||
audit are recorded. The live end-to-end path remains blocked, and the full
|
||||
web test command retains two existing PresentationRoute failures; neither
|
||||
is being represented as passing evidence. Historical implementation plan:
|
||||
[`defense rehearsal gate`](historical/superpowers/plans/2026-07-13-defense-rehearsal-gate.md).
|
||||
Route matrix: [`presentation rehearsal matrix`](runbooks/presentation-rehearsal-matrix.md);
|
||||
Story-flow audit: [`presentation story audit`](runbooks/presentation-story-audit.md);
|
||||
dated evidence: [`presentation rehearsal log`](runbooks/presentation-rehearsal-log.md).
|
||||
|
||||
|
||||
Reference in New Issue
Block a user