docs: plan editorial presentation redesign

This commit is contained in:
lda
2026-07-05 16:42:44 +07:00 Verified
parent a8402a4d1d
commit 7749a1820d
6 changed files with 1778 additions and 46 deletions
+12 -5
View File
@@ -92,14 +92,21 @@ Implementation order:
9 and 10. The canonical replay now drives an interpreted operation surface,
persistent execution graph, typed interrupt contract, and raw evidence
drawer. Design:
[`workflow takes the stage`](superpowers/specs/2026-07-05-workflow-takes-stage-visual-design.md).
[`workflow takes the stage`](historical/superpowers/specs/2026-07-05-workflow-takes-stage-visual-design.md).
Implementation:
[`workflow takes the stage plan`](historical/superpowers/plans/2026-07-05-workflow-takes-stage-visual.md).
11. Next: adopt source-owned AI Elements chat primitives against existing
11. Next: replace whole-stage theme switching with one scalable Editorial
Canvas and prove the reusable recursive Interactive Figure through Scene 6.
Design:
[`defense presentation storyboard`](superpowers/specs/2026-07-04-defense-presentation-storyboard-design.md).
Implementation:
[`editorial canvas and Interactive Figure plan`](superpowers/plans/2026-07-05-editorial-canvas-interactive-figure.md).
12. Then: adopt source-owned AI Elements chat primitives against existing
`AgentMessagePart` / `AgentDriver` contracts.
12. Future: implement final scene visuals, motion choreography, evidence assets,
and rehearsal timing.
13. Add a static slide/appendix shell only after presentation mode is clear.
13. Future: implement Schema Form Surface and synchronized Approval Session.
14. Future: implement Guided Run Beat Gates, presenter companion, Scene 10
product graph, final scene visuals, evidence assets, and rehearsal timing.
15. Add a static slide/appendix shell only after presentation mode is clear.
Astro remains an option, not the default next surface.
Boundaries: this is not a production admin panel, generic visual workflow