docs: reconcile consolidated defense story

This commit is contained in:
lda
2026-07-13 14:37:56 +07:00 Verified
parent c3bef1dc8a
commit 7a4554b21e
21 changed files with 209 additions and 205 deletions
+10 -10
View File
@@ -148,8 +148,8 @@ location.reload();
When a stateful demo deep link is opened before this browser session has started
a live run, the presentation selects the reviewed recording for that beat even
if the loopback health probe succeeds. Scene 8's request and Send action remain
local replay behavior; start the live path from the Scene 10 run operation.
if the loopback health probe succeeds. Scene 7's request and Send action remain
local replay behavior; start the live path from the Scene 9 run operation.
Otherwise the typed interrupt, output, and trace links remain useful
replay-backed entry points.
@@ -256,19 +256,19 @@ Say:
## Twenty-Five-Minute Timing
Target an 11:45 must-say path plus 1:15 for navigation and demo transitions,
Target an 11:00 must-say path plus 1:15 for navigation and demo transitions,
leaving 12 minutes for questions.
| Time | Segment | Notes |
|---:|---|---|
| 0:00-1:30 | Title and problem | AI-agent goal becomes a workflow substrate contribution |
| 1:30-2:15 | Positioning | Adjacent systems and the prototype's narrower position |
| 2:15-5:30 | Architecture and authoring | Planner/runtime boundary, lifecycle, implementation, authoring |
| 5:30-8:30 | Prepared demonstration | Request, deployment, start, interrupt, resume, output, trace |
| 8:30-10:30 | Evaluation | 36 audited trials as bounded engineering evidence |
| 10:30-11:45 | Limits and conclusion | Security, scheduling, evaluation, and agent-layer boundaries |
| 11:45-13:00 | Transition buffer | Navigation, interaction, and demo delay |
| 13:00-25:00 | Questions | Use prepared Q&A branches when available |
| 2:15-4:36 | Architecture and lifecycle | Planner/runtime boundary, lifecycle, and architecture |
| 4:36-7:45 | Prepared demonstration | Request, authoring, deployment, start, interrupt, resume, output, trace |
| 7:45-9:45 | Evaluation | 36 audited trials as bounded engineering evidence |
| 9:45-11:00 | Limits and conclusion | Security, scheduling, evaluation, and agent-layer boundaries |
| 11:00-12:15 | Transition buffer | Navigation, interaction, and demo delay |
| 12:15-24:15 | Questions | Use prepared Q&A branches when available |
Use [`defense-speech-and-claim-audit.md`](defense-speech-and-claim-audit.md)
for the rehearsed speech, evidence qualifications, and prioritized Q&A.
@@ -316,7 +316,7 @@ Answer:
## Pre-Defense Checklist
1. Start `/present` with the intended target. Verify Scene 8 submits the prepared
1. Start `/present` with the intended target. Verify Scene 7 submits the prepared
request, and verify the prepared-run action appears on the demo scenes when
the live badge is ready.
2. Complete one submitted branch and confirm the same run reaches output and