docs: complete guided run beat gates
This commit is contained in:
@@ -125,9 +125,10 @@ Implementation order:
|
||||
live/replay execution all share `useDemoTimeline`; AI SDK remains a later
|
||||
driver for the same seam. Implementation:
|
||||
[`presentation chat timeline bridge`](historical/superpowers/plans/2026-07-09-presentation-chat-timeline-bridge.md).
|
||||
17. Active: implement Guided Run Beat Gates so Scene 10 approval buttons and
|
||||
chat approval requests drive the same deterministic demo timeline. Plan:
|
||||
[`guided run beat gates`](superpowers/plans/2026-07-09-guided-run-beat-gates.md).
|
||||
17. Completed: guided run beat gates connect Scene 10 schema approval, chat
|
||||
approval, graph focus, and evidence transitions into one deterministic
|
||||
presenter sequence. Implementation:
|
||||
[`guided run beat gates`](historical/superpowers/plans/2026-07-09-guided-run-beat-gates.md).
|
||||
18. Future: presenter companion, Scene 10 product graph, final scene visuals,
|
||||
evidence assets, and rehearsal timing.
|
||||
19. Add a static slide/appendix shell only after presentation mode is clear.
|
||||
@@ -199,11 +200,10 @@ Presentation wishlist / defense readiness:
|
||||
The current `{ "type": "object" }` proof is enough for architecture evidence,
|
||||
but the product demo needs a real schema-derived approval form with submitted
|
||||
and cancelled outcomes.
|
||||
- Active: Guided run beat gates make the prepared agent/demo sequence explicitly
|
||||
wait for approval decisions and evidence reveals instead of relying on loose
|
||||
timing. This connects the chat run, schema approval form, graph focus, and
|
||||
evidence inspector into one deterministic presenter sequence. Plan:
|
||||
[`guided run beat gates`](superpowers/plans/2026-07-09-guided-run-beat-gates.md).
|
||||
- Completed: guided run beat gates connect Scene 10 schema approval, chat
|
||||
approval, graph focus, and evidence transitions into one deterministic
|
||||
presenter sequence. Implementation:
|
||||
[`guided run beat gates`](historical/superpowers/plans/2026-07-09-guided-run-beat-gates.md).
|
||||
- Evidence assets and rehearsal timing: prepare fallback screenshots/recordings,
|
||||
expected run states, and a timed walkthrough checklist for a 15-minute defense.
|
||||
- Presenter companion feasibility: decide whether phone/laptop control is local
|
||||
|
||||
Reference in New Issue
Block a user