docs: complete presentation lifecycle story expansion

This commit is contained in:
lda
2026-07-09 21:45:05 +07:00 Verified
parent 01b0bc6028
commit 915f3e64d5
2 changed files with 9 additions and 9 deletions
+9 -9
View File
@@ -153,13 +153,13 @@ Implementation order:
Cancel is terminal in presentation mode and does not advance into submitted Cancel is terminal in presentation mode and does not advance into submitted
evidence. Implementation: evidence. Implementation:
[`Scene 10 factual run state`](historical/superpowers/plans/2026-07-09-scene-10-factual-run-state.md). [`Scene 10 factual run state`](historical/superpowers/plans/2026-07-09-scene-10-factual-run-state.md).
21. Next: presentation lifecycle story expansion splits the current crowded run 21. Completed: presentation lifecycle story expansion splits the demo climax
proof into prepared lifecycle, run start, typed human boundary, and into prepared lifecycle, run start, typed human boundary, and
resume/output/evidence scenes. Draft -> Artifact -> Deployment -> Run must resume/output/evidence scenes so Draft -> Artifact -> Deployment -> Run is
be visible before the run inspector details. Design: visible before the run inspector details. Design:
[`presentation lifecycle story expansion`](superpowers/specs/2026-07-09-presentation-lifecycle-story-expansion-design.md). [`presentation lifecycle story expansion`](superpowers/specs/2026-07-09-presentation-lifecycle-story-expansion-design.md).
Plan: Implementation:
[`presentation lifecycle story expansion plan`](superpowers/plans/2026-07-09-presentation-lifecycle-story-expansion.md). [`presentation lifecycle story expansion plan`](historical/superpowers/plans/2026-07-09-presentation-lifecycle-story-expansion.md).
22. Future: presenter companion, final scene visuals, evidence assets, and 22. Future: presenter companion, final scene visuals, evidence assets, and
rehearsal timing. rehearsal timing.
23. Add a static slide/appendix shell only after presentation mode is clear. 23. Add a static slide/appendix shell only after presentation mode is clear.
@@ -242,12 +242,12 @@ Presentation wishlist / defense readiness:
[`Scene 10 guided product moment`](superpowers/specs/2026-07-09-scene-10-guided-product-moment-design.md). [`Scene 10 guided product moment`](superpowers/specs/2026-07-09-scene-10-guided-product-moment-design.md).
Implementation: Implementation:
[`Scene 10 guided product moment plan`](historical/superpowers/plans/2026-07-09-scene-10-guided-product-moment.md). [`Scene 10 guided product moment plan`](historical/superpowers/plans/2026-07-09-scene-10-guided-product-moment.md).
- Next: presentation lifecycle story expansion makes the demo climax less - Completed: presentation lifecycle story expansion makes the demo climax less
run-only by adding explicit prepared lifecycle scenes before the run, run-only by adding explicit prepared lifecycle scenes before the run,
interrupt, output, and trace proof. Design: interrupt, output, and trace proof. Design:
[`presentation lifecycle story expansion`](superpowers/specs/2026-07-09-presentation-lifecycle-story-expansion-design.md). [`presentation lifecycle story expansion`](superpowers/specs/2026-07-09-presentation-lifecycle-story-expansion-design.md).
Plan: Implementation:
[`presentation lifecycle story expansion plan`](superpowers/plans/2026-07-09-presentation-lifecycle-story-expansion.md). [`presentation lifecycle story expansion plan`](historical/superpowers/plans/2026-07-09-presentation-lifecycle-story-expansion.md).
- Evidence assets and rehearsal timing: prepare fallback screenshots/recordings, - Evidence assets and rehearsal timing: prepare fallback screenshots/recordings,
expected run states, and a timed walkthrough checklist for a 15-minute defense. expected run states, and a timed walkthrough checklist for a 15-minute defense.
- Presenter companion feasibility: decide whether phone/laptop control is local - Presenter companion feasibility: decide whether phone/laptop control is local