docs: plan audited defense presentation follow-ups
This commit is contained in:
@@ -241,22 +241,22 @@ Say:
|
||||
> can represent, validate, execute, interrupt, resume, and inspect a reusable
|
||||
> workflow.
|
||||
|
||||
## Fifteen-Minute Timing
|
||||
## Twenty-Five-Minute Timing
|
||||
|
||||
Target a 12-minute main path, leaving three minutes for questions.
|
||||
Target a 13-minute main path, leaving 12 minutes for questions.
|
||||
|
||||
| Time | Segment | Notes |
|
||||
|---:|---|---|
|
||||
| 0:00-1:00 | Title and framing | AI-agent goal -> workflow substrate contribution |
|
||||
| 1:00-2:30 | Problem and positioning | Automation is hard; AI needs durable workflow contracts |
|
||||
| 2:30-4:00 | Planner/runtime boundary | External planner proposes; platform owns execution |
|
||||
| 4:00-5:30 | Lifecycle | Draft, artifact, deployment, run |
|
||||
| 5:30-7:00 | Architecture zoom | Client/API/runtime/NodeUse |
|
||||
| 7:00-8:30 | Authoring and repair | Discovery, schemas, diagnostics, repair hints |
|
||||
| 8:30-10:30 | Demo | Start, interrupt, approval/resume, trace |
|
||||
| 10:30-11:30 | Evaluation | 36 audited trials as bounded engineering evidence |
|
||||
| 11:30-12:00 | Limits and future work | Agent wrapper, security, scheduling, comparative studies |
|
||||
| 12:00-15:00 | Questions | Use prepared Q&A branches when available |
|
||||
| 0:00-1:30 | Title and problem | AI-agent goal becomes a workflow substrate contribution |
|
||||
| 1:30-5:20 | Positioning and architecture | Planner/runtime boundary, lifecycle, implementation, authoring |
|
||||
| 5:20-9:45 | Prepared demonstration | Request, deployment, start, interrupt, resume, output, trace |
|
||||
| 9:45-11:00 | Evaluation | 36 audited trials as bounded engineering evidence |
|
||||
| 11:00-12:30 | Limits and conclusion | Security, scheduling, evaluation, and agent-layer boundaries |
|
||||
| 12:30-13:00 | Transition buffer | Finish navigation and hand over to questions |
|
||||
| 13:00-25:00 | Questions | Use prepared Q&A branches when available |
|
||||
|
||||
Use [`defense-speech-and-claim-audit.md`](defense-speech-and-claim-audit.md)
|
||||
for the rehearsed speech, evidence qualifications, and prioritized Q&A.
|
||||
|
||||
## Expected Hard Questions
|
||||
|
||||
@@ -301,8 +301,9 @@ Answer:
|
||||
|
||||
## Pre-Defense Checklist
|
||||
|
||||
1. Start `/present` with the intended target and verify the Scene 8 `Run
|
||||
prepared workflow` action is enabled when the live badge is ready.
|
||||
1. Start `/present` with the intended target. Verify Scene 8 submits the prepared
|
||||
request, and verify the prepared-run action appears on the demo scenes when
|
||||
the live badge is ready.
|
||||
2. Complete one submitted branch and confirm the same run reaches output and
|
||||
trace.
|
||||
3. Reload, complete one revision-requested branch, and confirm no issues plus
|
||||
|
||||
Reference in New Issue
Block a user