fix: address presentation review findings
This commit is contained in:
+14
-11
@@ -204,8 +204,8 @@ Presentation visual audit, July 11:
|
||||
|
||||
## Completed: Presentation Recomposition And Authoring Story
|
||||
|
||||
Scenes 8 and 9 are now implemented as authentic external-agent request and
|
||||
factual prepared-authoring proof. Scene 8 is one local request-to-first-turn
|
||||
Scenes 8 and 9 now present an external-agent request through a scripted
|
||||
presentation surface and factual prepared-authoring proof. Scene 8 is one local request-to-first-turn
|
||||
beat; its obsolete `/handoff` route fails closed. Scene 9 keeps a persistent
|
||||
prepared assistant pane beside five factual phase visuals in an adaptive
|
||||
approximately 35/65 split. The obsolete receipt/trace modal and lower chat dock
|
||||
@@ -244,8 +244,9 @@ Recommended next visual slices:
|
||||
[`presentation evaluation and closing`](superpowers/specs/2026-07-10-presentation-evaluation-closing-design.md).
|
||||
Implementation:
|
||||
[`presentation evaluation and closing plan`](historical/superpowers/plans/2026-07-10-presentation-evaluation-closing.md).
|
||||
6. Completed: Presentation agent authoring story rebuilds Scenes 8 and 9 as
|
||||
authentic external-agent handoff and factual prepared-authoring proof.
|
||||
6. Completed: Presentation agent authoring story rebuilds Scenes 8 and 9 as a
|
||||
scripted surface representing an external-agent handoff and factual
|
||||
prepared-authoring proof.
|
||||
Implementation:
|
||||
[`presentation agent authoring story plan`](historical/superpowers/plans/2026-07-11-presentation-agent-authoring-story.md).
|
||||
7. Completed: Scene 1 now introduces the agent-shaped product goal through
|
||||
@@ -261,7 +262,7 @@ Recommended next visual slices:
|
||||
Implementation:
|
||||
[`defense presentation rehearsal`](historical/superpowers/plans/2026-07-12-defense-presentation-rehearsal.md).
|
||||
9. Completed: Scenes 7-9 now use one dominant factual artifact per beat on the
|
||||
Editorial Canvas: authoring/repair evidence, an authentic light agent chat,
|
||||
Editorial Canvas: authoring/repair evidence, a scripted light agent chat,
|
||||
and a light prepared lifecycle canvas with synchronized secondary chat.
|
||||
Implementation:
|
||||
[`Scenes 7-9 editorial focal proof`](historical/superpowers/plans/2026-07-12-scenes-7-9-editorial-focal-proof.md).
|
||||
@@ -287,12 +288,14 @@ separate activity after these surfaces are stable.
|
||||
turns, and Deployment Send records a truthful local run request without
|
||||
execution or RPC. Implementation:
|
||||
[`Scene 9 staged message box`](historical/superpowers/plans/2026-07-12-scene-9-staged-message-box.md).
|
||||
The boundary is explicit: Scenes 10–12 own run activation, approval,
|
||||
resume, output, and trace evidence.
|
||||
3. **Completed: Live/replay truth and run activation:** Scene 10 exposes the
|
||||
prepared-run action outside the hidden chat, retries the existing health
|
||||
probe, starts live execution explicitly, and keeps direct links and failed
|
||||
services on truthful replay evidence. Implementation:
|
||||
The boundary is explicit: the compact demo footer may start the prepared run
|
||||
from Scenes 8–12, while Scenes 10–12 own run, decision, resume, output, and
|
||||
trace evidence.
|
||||
3. **Completed: Live/replay truth and run activation:** the compact footer rail
|
||||
across Scenes 8–12 exposes the prepared-run action, retries the existing
|
||||
health probe, starts live execution explicitly, and keeps direct links and
|
||||
failed services on truthful replay evidence. Scene 10 remains the semantic
|
||||
start of execution evidence. Implementation:
|
||||
[`presentation live/replay activation`](historical/superpowers/plans/2026-07-12-presentation-live-replay-activation.md).
|
||||
4. **Completed: Scene 11 compression:** reduce the typed-human-boundary scene to two
|
||||
beats: interrupt context and approval decision. Cancellation remains a
|
||||
|
||||
Reference in New Issue
Block a user