chore: remove generated Task 3 report
This commit is contained in:
@@ -1,48 +0,0 @@
|
|||||||
# Task 3 Report
|
|
||||||
|
|
||||||
## Scope
|
|
||||||
|
|
||||||
Removed cancel-specific presentation layout plumbing from `DemoWorkflowScene`.
|
|
||||||
The approval beat remains the sole approval layout mapping, and the existing
|
|
||||||
Scene 11 composition test continues to assert `data-demo-layout="approval"`.
|
|
||||||
|
|
||||||
The approval composition regression coverage now asserts that both `Submit`
|
|
||||||
and `Request revision` controls are enabled and that the factual outcomes are
|
|
||||||
visible as `submitted / cancelled`.
|
|
||||||
|
|
||||||
## TDD Evidence
|
|
||||||
|
|
||||||
### RED
|
|
||||||
|
|
||||||
Command:
|
|
||||||
|
|
||||||
```text
|
|
||||||
pnpm --dir web --filter @lda/console test -- src/presentation/DemoWorkflowScene.test.tsx src/presentation/GuidedProductMoment.test.tsx
|
|
||||||
```
|
|
||||||
|
|
||||||
Result: failed with 2 tests failing because the new slash-delimited outcome
|
|
||||||
assertion was absent; the existing UI rendered `submitted, cancelled`.
|
|
||||||
|
|
||||||
### GREEN
|
|
||||||
|
|
||||||
Changed the decision-form outcome presentation from comma-delimited to
|
|
||||||
slash-delimited factual contract output, then simplified `DemoWorkflowScene`
|
|
||||||
to map only `approval` to the approval layout.
|
|
||||||
|
|
||||||
The same focused command passed with 2 test files and 31 tests passing.
|
|
||||||
|
|
||||||
## Verification
|
|
||||||
|
|
||||||
- Focused Scene 11 test command passed: 2 files, 31 tests.
|
|
||||||
- No `cancel` render branch remains in `DemoWorkflowScene.tsx`.
|
|
||||||
- The unrelated working-tree change in `authoring/Scene8ChatEntry.tsx` was not modified or staged.
|
|
||||||
|
|
||||||
## Deviations
|
|
||||||
|
|
||||||
- `InterruptDecisionForm.tsx` was changed although it was not in the primary Task 3 file list. The focused regression test demonstrated that the required factual `submitted / cancelled` output was otherwise impossible in the Scene 11 renderer; no behavior or outcome projection was changed.
|
|
||||||
- `DemoWorkflowScene.test.tsx` required no net diff because its existing approval composition test already asserts the approval root layout and both controls.
|
|
||||||
|
|
||||||
## Concerns
|
|
||||||
|
|
||||||
- The canonical interrupt payload still uses the underlying `cancelled` outcome; only its display separator changed. The operator action remains `Request revision` as required by the Task 2 contract.
|
|
||||||
- The pre-existing unrelated `Scene8ChatEntry.tsx` modification remains unstaged.
|
|
||||||
Reference in New Issue
Block a user