remove these mf AGAIN

This commit is contained in:
lda
2026-07-13 01:01:29 +07:00 Verified
parent 1e990847dc
commit a8334ddb86
4 changed files with 0 additions and 188 deletions
-72
View File
@@ -1,72 +0,0 @@
# Task 1 Implementation Report
## Scope
Implemented the canonical defense rehearsal route manifest and documentation
from `task-1-brief.md`.
- Added `scripts/presentation-rehearsal-routes.json` with all 42 current
`mainScenes` scene/beat pairs. Each object has exactly `sceneId`, `beatId`,
`route`, and `fileStem`.
- Added `docs/runbooks/presentation-rehearsal-matrix.md` with one row per route,
including the presenter sentence, dominant/supporting visuals, chat mode,
evidence mode, and exact fallback route.
- Linked the matrix from `docs/runbooks/defense-presentation.md` and explicitly
described it as a rehearsal checklist rather than a new story or product
contract.
- Extended `storyboard-navigation.test.ts` to validate unique and complete
bidirectional coverage against `mainScenes`, exact manifest keys, canonical
route fields, and hash round-trips through `hashForLocation` and
`locationFromHash`.
## Verification
The test-first check was performed before creating the manifest: the focused
Vitest suite failed with an import-resolution error because
`scripts/presentation-rehearsal-routes.json` did not exist. After adding the
manifest, the same suite passed.
Exact verification commands and results:
```text
pnpm --dir web/apps/console test -- src/presentation/storyboard-navigation.test.ts
PASS: 1 test file, 11 tests
pnpm --dir web/apps/console typecheck
PASS: tsc -b --pretty false
PowerShell JSON validation using ConvertFrom-Json
PASS: manifest entries: 42
PASS: manifest keys: beatId, fileStem, route, sceneId
PowerShell matrix row count
PASS: matrix route rows: 42
git diff --check
PASS: no whitespace errors; Git reported only LF-to-CRLF normalization warnings
```
## Self-Review
- The manifest uses the current `mainScenes` IDs, including `approval`,
`resume-output-evidence`, and `conclusion/questions`; no historical
interrupt-evidence or workflow-demo route names were introduced.
- The coverage test fails on a missing beat with its scene ID and rejects stale
manifest entries, duplicate pairs, incorrect canonical route strings, and
malformed navigation round-trips.
- Matrix evidence references remain bounded by existing storyboard pointers,
prepared replay evidence, and the defense runbook fallback wording. No
expected output was invented.
- All current scene beats use `hidden` chat mode in the storyboard metadata, so
the matrix records `hidden` consistently rather than inventing full, rail, or
dock modes.
## Deviations And Concerns
No functional deviations from the brief. The repository emits line-ending
normalization warnings for the touched text files during Git operations; these
are not whitespace errors and do not affect the committed content.
## Commit
Implementation commit: `fce33934` (`docs: define presentation rehearsal route matrix`)
-31
View File
@@ -1,31 +0,0 @@
# Task 2 Implementation Report
## Scope
Implemented the repeatable screenshot runner for the Task 1 rehearsal manifest.
- Added `scripts/presentation-rehearsal.ps1` with configurable base URL, output root, and viewports.
- The runner loads `scripts/presentation-rehearsal-routes.json`, validates the manifest is present/non-empty, captures every route at `1280,720` and `1024,768`, waits 800 ms, and fails with startup/capture errors.
- Added the rehearsal output directory to `.gitignore`.
- Documented the runner in `docs/runbooks/presentation-visual-review.md`.
## Verification
```text
pwsh -File scripts/presentation-rehearsal.ps1
PASS: 42 routes x 2 viewports = 84 screenshots captured
git diff --check
PASS: no whitespace errors; only line-ending normalization warnings
```
The users presentation dev server was already running. No server was stopped
or restarted.
## Commit
Implementation commit: `3770e345` (`test: add repeatable presentation screenshot rehearsal`)
## Concerns
The script captures screenshots but does not perform DOM geometry assertions;
those remain in the route/browser review and later rehearsal tasks as planned.
-33
View File
@@ -1,33 +0,0 @@
# Task 3 Report
## Changed Files
- `web/apps/console/src/presentation/presentation-rehearsal.test.ts`
- Added an exact set comparison between `mainScenes` and the expected 14 scene IDs.
- Verifies expected beat counts and canonical beat IDs for every scene.
- Failure messages identify the missing scene or `scene/beat` pair.
- `web/apps/console/src/presentation/PresentationRoute.test.tsx`
- Added direct-hash coverage for the ten intended representative routes, including Scene 8 (`#scene/agent-handoff/request`).
- Verifies visible accessible headings and demo-chrome ownership for Scenes 8 through 12.
- Uses the presentation footer's accessible action/status surfaces instead of `data-testid` for demo-chrome ownership.
- Added no-accidental-chrome coverage for title, problem, architecture, evaluation, and conclusion routes.
- Verifies prepared lifecycle assistant-pane ownership, footer ownership, and exactly one run action.
## Deviations
- `#scene/conclusion/questions` intentionally asserts the visible `Thesis contribution` discussion-index heading. That beat renders the examiner discussion index instead of the `Limits and Conclusion` scene caption.
- The typed approval route intentionally checks for the visible demo rail rather than a run button because its chrome is a paused review status with a `Submit` action.
## Bugs
- No production bugs found. No production files were changed.
## Verification
- `pnpm --dir web/apps/console test -- src/presentation/presentation-rehearsal.test.ts src/presentation/PresentationRoute.test.tsx`
- Passed: 2 test files, 68 tests.
- `pnpm --dir web/apps/console typecheck`
- Passed: `tsc -b --pretty false`.
- `git diff --check`
- Passed with no whitespace errors.
- Self-review confirmed the changes are limited to the Task 3 test contracts and this report.
-52
View File
@@ -1,52 +0,0 @@
# Task 6 Report
## Scope
Completed the final presentation demo chrome integration task without changing
production APIs or adding product behavior.
- Added route-level regressions for Scene 8 -> Scene 10 operation -> Scene 10
graph -> title backtracking, stale launch/replay chrome, and approval paused
label removal after submit.
- Added CSS contract assertions for compact footer rail sizing and removal of
`.demo-run-launch-control`.
- Updated `web/README.md` to document the Scenes 8-12 footer rail and removed
stale Scene 8 probing and Scene 10 in-scene launch claims.
- Marked Scene 10 factual graph/proof work complete in the roadmap, linked the
design and implementation plan, and kept file-preview work deferred.
- Moved the completed Scene 10 plan to `docs/historical/superpowers/plans/`.
## Verification
- Focused route/CSS tests: passed, 2 files, 63 tests.
- Full web test gate: passed, 91 files, 715 tests.
- Web typecheck: passed for console, RPC package, and server.
- Web build: passed. Vite emitted the existing chunk-size warning for the main
bundle; no build failure occurred.
- `git diff --check`: passed.
Screenshots were captured at 1280x720 after 2-second waits using the existing
running server and Playwright tooling. Files were written outside the
repository under `%TEMP%`:
- `task-6-title.png`
- `task-6-scene-8.png`
- `task-6-operation.png`
- `task-6-approval.png`
- `task-6-output.png`
## Review
Two-axis repository review against `46f25b45`:
- Standards axis: no findings.
- Spec axis: no missing requirements, scope creep, or incorrect Task 6
implementation findings.
## Deviations And Concerns
- The first parallel full-gate invocation showed two existing route-test
failures caused by cross-file Vitest interference. The required rerun with
servers unchanged passed completely.
- Browser console output contained one `favicon.ico` 404 from the existing dev
server. No presentation route error was observed.